30%

Reduced Design Iteration

20%

Improved Structural Reliability

BACKGROUND

A Pick & Place Pillar Equipment was developed to assist shop-floor operators in lifting and handling heavy components safely and efficiently.

CHALLENGE

  • Withstanding rated lifting loads safely
  • Achieving required arm reach and rotational movement
  • Minimizing structural deformation under maximum loading
  • Ensuring adequate factor of safety for long-term operation
  • Optimizing weight while maintaining structural integrity
  • Validating design prior to manufacturing

APPROACH

  • Finite Element Analysis (FEA) using ANSYS Mechanical.
  • Meshing and load case definition.
  • Stress, deformation, and safety factor evaluation.
  • Design optimization based on simulation results.
  • Final validation and manufacturing release.

30% Design Iterations Reduced

20% Structural Reliability Improvement

15% Weight Optimization